This Focused Performance Weblog started life as a "business management blog" containing links and commentary related primarily to organizational effectiveness with a "Theory of Constraints" perspective, but is in the process of evolving towards primary content on interactive and mobile marketing. Think of it as about Focusing marketing messages for enhanced Performance. If you are on an archive page, current postings are found here.

Friday, December 27, 2002

Consistent Leadership Behavior as a Source of "Intended Consequences" -- A while ago, a discussion list I participate in carried a thread about how to engrain and assure appropriate behaviors in management of a project organization. The following had come into my inbox from a different source, and for some reason I thought of that thread...
There's a story about an MIT student who spent an entire summer going to the Harvard football field every day wearing a black and white striped shirt, walking up and down the field for ten or fifteen minutes throwing birdseed, blowing a whistle, and then walking off the field.

At the end of the summer, it came time for the first Harvard home football game, the referee walked onto the field and blew the whistle, and the game had to be delayed for a half hour to wait for the birds to get off of the field.
...A clear demonstration of the power of consistently walking the "squawk."

There's also a story from my personal experience that shows how deviating from the promised behaviors can get management into trouble. It happened in an implementation of Critical Chain-based multi-project management at a telecom equipment firm building systems of integrated hardware and software. Critical Chain training was given to management first (since they had to have the ability to "walk the talk" from the get-go), and then to members of the project teams as the projects were revisited for completeness of plan and alignment with the multi-project processes.

One of the key concepts demonstrated by games and simulations in the training is the idea of the "project as relay race," as opposed to the usually date-driven metaphor of a train schedule. The team picked up on this idea with a vengeance -- so much so that they went out to the local sporting goods store and bought a set of relay race batons, which were painted brightly, and attached to a rope so that they could be hung on a doorknob or on the entrance to a cubicle. The batons were passed along from resource to resource along the critical chain (the resource-leveled critical path) of the project, the idea being that if the baton was in sight, you were not to interrupt it's carrier/keeper and instead address his/her supervisor with issues that might normally be addressed by that person. This allowed resources on the critical chain to work with head down, uninterrupted, and protected from pressures to multi-task, thereby speeding the project around the track from critical leg to critical leg of the race to the cash register.

Well, the story comes to a climax when one of the managers forgets his promise to the team -- the promise to support "relay race behaviors" and to help "drive out multi-tasking" among project participants. This manager keeps interrupting one of the project players assigned to a critical chain task, bringing the engineer into meetings, and asking for reports on non-project efforts -- meetings and reports that could be easily addressed by other members of the team. The engineer eventually reached the end of his patience, picked up the baton, and asked the manager if he had some place to put it -- some place very personal and potentially painful -- since it was obvious that the manager didn't respect the baton or the promises it embodied...
"Leadership should be born out of the understanding of the needs of those who would be affected by it." -- Marian Anderson
...In a follow-up session with the client team, when I was told this story, my reaction was only slightly conflicted. On the one hand, I'd be the last one to condone physical violence or threats of it, but on the other hand, it was clear that the engineer had gotten the message that the manager had not. Project participants, once they discover how much they can achieve if allowed to work in a single-tasking state of flow, are loathe to allow managers to take that high-performance environment away. Admittedly, it takes managers a bit longer to feel the real benefits, as they might need to see to believe the enhanced pace of project completions and unleashed capacity that results, but for most, effective education, indoctrination, and simulation allows them to suspend disbelief long enough to effect improvement, by walking the talk.

For those that don't, there are always the batons.

posted by Frank - Permanent Link - |

Current Posts (Main Blog Page)

Previous Posts

It is a common delusion that you make things better by talking about them. - Dame Rose Macaulay



What's this XML thingie all about?


View Frank Patrick's LinkedIn profileView Frank Patrick's profile



Google
Web focusedperformance.com


FP's Recommended Reading
- From the FP Bookshelf...

...from My AStore

...and some ideas from Amazon...


Best of the FP Blog Archive
- The really good stuff...

Strategic Thinking and Improvement

Enterprise PM - It Starts with Strategic Interdependence

Face Reality

How to Think With Your Gut

Hugger-Mugger and Helter-Skelter

Managing for Murphy, Satan, and Yourself

More of the Same (Local/Global)

PMI Congress Notes: Using Risk Management for Strategic Advantage

Tell Me How You'll Measure Me and Ah, But What to Measure?

What's in Your Strategy?

Why Can't We All Just Get Along?

Why TOC Works
Project and Multi-Project Management
Critical Chain and (not or) XP

Defining Project Success (But for Whom?)

Down 'n Dirty w/TOC and PM (Part 1 of 5 consecutive posts)

End of Project Review

If Project Management is the Answer, What's the Question?

In Defense of Planning

It Ain't the Tools

Lessons Learned, Revisited

Predicting Uncertain Futures

Project Conflicts

Project Determinism (and other myths)

Project Portfolio Management

Promises, Predictions, and Planning

Removing Bottlenecks - A Core Systems Design Principle

Stage Gates and Critical Chain

Ten Top Sources of Project Failure (The Executive Version)

The Meaning of "Schedule"
Leadership and Change Management
Consistent Leadership Behavior

Invisible Dogma - Perpetuating Paradigms

Nothing But Value

On Assumption Busting

Personal Productivity - An Excuse?

The Psychology of Change Management

FP's Blogroll
- Other weblogs and sites I read


FP's Ryze Page


FP's Technorati Profile
- Click the pic



Who links to FP?


For Your Charitable Consideration:

Give Something Back Foundation

Global Virtual Classroom


FP's Link List
- Selected Sites and Resources

Critical Chain Discussion Group

Lilly Software: Visual DBR

Sciforma PS (Critical Chain Software)

Spherical Angle (Critical Chain Software)

Synchrono Supply Chain Planning Software


FP Blog Archives
- All the oldies, but goodies...

Current
10/09 | 09/09 | 08/09 | 07/09 | 06/09 | 05/09 | 04/09 | 03/09 | 02/09 | 01/09 | 12/08 | 11/08 | 10/08 | 09/08 | 08/08 | 07/08 | 06/08 | 05/08 | 04/08 | 03/08 | 02/08 | 01/08 | 12/07 | 11/07 | 10/07 | 09/07 | 08/07 | 07/07 | 06/07 | 05/07 | 04/07 | 03/07 | 02/07 | 01/07 | 12/06 | 11/06 | 10/06 | 09/06 | 08/06 | 07/06 | 06/06 | 05/06 | 04/06 | 03/06 | 02/06 | 01/06 | 12/05 | 11/05 | 10/05 | 09/05 | 08/05 | 07/05 | 06/05 | 05/05 | 04/05 | 03/05 | 02/05 | 01/05 | 12/04 | 11/04 | 10/04 | 09/04 | 08/04 | 07/04 | 06/04 | 05/04 | 04/04 | 03/04 | 02/04 | 01/04 | 12/03 | 11/03 | 10/03 | 09/03 | 08/03 | 07/03 | 06/03 | 05/03 | 04/03 | 03/03 | 02/03 | 01/03 | 12/02 | 11/02 | 10/02 | 09/02 | 08/02 | 07/02 | 06/02 | 03/02 | 02/02 | 12/01 | 11/01 | 10/01 | 09/01 | 08/01 | 06/01 | 02/01 | 01/01 | 12/00


Powered by Blogger

If you are interested in adding an easily updated weblog to your site, I would suggest you look into the free service provided by Blogger.

Who is FP?
Contact Focused Performance